CBH Metro Grain Centre

Located in the Shire of Kalamunda, the Metro Grain Centre (MGC) was created in 1998 to establish a world-class grain-handing complex on the tail of both standard and narrow gauge rail lines. It is connected by road and rail with the port in Fremantle, for container shipping, and Kwinana port for bulk handling of grain. It has a total storage capacity of 223,785 tonnes and consists of 10 blocks of silos.

Delonix Solutions provided:

  • Full Plant 3D Scanning and Surveying

  • Chute, Earthwork and Access Engineering and Shop Detailing

  • Wear Analysis

  • Dust Extraction System Re-Design

Our Latest Projects

Innovative Computer-aided Design Engineering Capabilities.

We primarily work within the Resources, Oil and Gas, and Heavy Industry sectors, with a strong foundation built with small to medium size commercial businesses.