Cowal Gold open pit continuation project

Evolution Mining

Project Overview

Client:

Evolution Mining

Year:

-

Location:

New South Wales

Commodity:

Gold

Project Manager:

Philippe Vatin

Evolution Mining owns and operates Cowal Gold underground mine; an open pit gold operation located 350km west of Sydney. As of March 2023, the first underground stop ore was mined and processed three months ahead of schedule. The Open Pit Continuation project is underway with a budget of $380 million and will increase Cowal’s production to 320,000 low-cost ounces by 2024. The project includes excavations, an underground workshop area, a paste fill plant and the installation of services.

Delonix Solutions provided engineering design for the following areas of the project:

  • Structural Engineering

Other Projects

Innovative computer-aided design engineering capabilities.

We primarily work within the Resources, Oil and Gas, and Heavy Industry sectors, with a strong foundation built with small to medium size commercial businesses.