Pilbara Minerals – Pilgangoora Lithium Project

Pilbara Minerals’ Pilgangoora Project is located approximately 120km from Port Hedland in Western Australia. Work is underway to expand lithium-tantalum production by 100,000 dmt per annum at the Pilgan Plant. The expansion includes construction of a primary rejection heavy media separation circuit and an integrated crushing and ore sorting facility that can process up to 5 Mtpa of ore throughput. In 2021, Pilbara Minerals acquired the Ngungaju Plant and undertook a series of improvement works to the processing facility.

Delonix Solutions provided engineering design for the following areas:

  • Stage 2 Major Plant Upgrade

  • Stage 3 Major Plant Upgrade

  • Full Plant 3D Scanning and Surveying

Our Latest Projects

Innovative Computer-aided Design Engineering Capabilities.

We primarily work within the Resources, Oil and Gas, and Heavy Industry sectors, with a strong foundation built with small to medium size commercial businesses.